Title 24 in 2026: California Energy Code Requirements for Homes, ADUs and Additions

What the 2025 California Energy Code (Title 24, Part 6), in effect since January 1, 2026, requires for new homes, ADUs, additions and alterations: heat pumps, solar PV sizing, battery-ready panels, addition rules by size, and the CF1R, CF2R and CF3R forms.

HearthPlans
Title 24 in 2026: California Energy Code Requirements for Homes, ADUs and Additions

Since January 1, 2026, the starting point for a new California home is a heat pump: for heating, and for hot water. That is the biggest change in the 2025 California Energy Code, Title 24, Part 6, which applies to permit applications submitted from that date. It is not a gas ban, and the code still offers a way to keep a gas furnace, but every design is now measured against an all-electric baseline.

If you are building a house, an ADU or an addition in California, or replacing windows or an HVAC system, Title 24 decides what has to be on your drawings, what has to be tested on site, and which forms the city needs before it signs off. This guide walks through it by project type, with the section of the Standards each rule comes from.


What changed on January 1, 2026

Topic2025 Energy CodeSection
Space heatingHeat pump in all 16 climate zones under the prescriptive path150.1(c)6
Water heatingHeat pump water heater, or a solar system with electric backup, under the prescriptive path150.1(c)8
Solar PVSized from the solar access roof area (SARA) as well as floor area150.1(c)14
Battery-readyRequired on new one- and two-unit homes with service over 125 A150.0(s)
WallsMandatory minimum R-15 in 2x4 and R-21 in 2x6 wood framing150.0(c)
WindowsMandatory maximum weighted U-factor of 0.40; prescriptive U-0.27 or 0.30 by zone150.0(q), 150.1(c)3
Heat pump checksRefrigerant charge verified on site in every climate zone150.1(c)7
Pools and spasNew primary pool and spa heaters: heat pump, solar, or at least 60% renewable or recovered energy110.4(c)

The field verifier long known as a HERS rater is now called an ECC-Rater, for Energy Code Compliance, and you will see that name on the forms.

Two ways to comply

The prescriptive path is a checklist. Meet every item in Section 150.1(c) for your climate zone, from insulation levels and window U-factors to a heat pump and a heat pump water heater, and the building complies.

The performance path is an energy model. Your energy consultant runs approved software that compares your design with a standard design built to the prescriptive list. If yours uses no more energy, measured as long-term system cost, it complies. This is how you trade: a better envelope or larger PV system in exchange for a gas furnace or more glass, for example. The performance path is also how most custom homes are done, because it gives the designer room.

Either way, some measures are mandatory whatever path you choose, such as the wall insulation minimums, the maximum window U-factor, ventilation and the battery-ready rules.

Find your climate zone

California has 16 climate zones, and many of the numbers in Title 24 change with them. Your zone comes from your ZIP code, using the list the California Energy Commission publishes. Coastal Los Angeles, the Central Valley and the Sierra end up with different insulation, window and verification requirements, so look up the zone before anyone specifies windows or equipment.

New homes

Which Title 24 rules apply: new home, new detached ADU, addition or alteration

Heat pumps for heating and hot water

Under the prescriptive path the heating system has to be a heat pump (150.1(c)6). Water heating has to be a single 240-volt heat pump water heater, one meeting the NEEA Advanced Water Heater Specification Tier 3 or higher, or a solar water heating system with electric backup and a solar savings fraction of at least 0.7 (150.1(c)8). Small homes get some room: a new dwelling of 500 square feet or less may use an electric water heater with point-of-use distribution, and a one-bedroom unit may use a 120-volt heat pump water heater.

To keep gas, use the performance path and make up the difference elsewhere. The mandatory electric-ready rules still apply, so circuits and space for future heat pump equipment, an electric cooktop and dryer are drawn in anyway.

Solar PV

New single-family homes need a solar PV system (150.1(c)14). From 2025 the required size is the smaller of two numbers: the solar access roof area (SARA) multiplied by 18 watts per square foot for a steep roof or 14 for a low-slope roof, and the result of Equation 150.1-C, which uses the climate zone and the conditioned floor area. SARA counts roofs, carports and covered parking able to carry panels, and leaves out areas with less than 70% annual solar access.

No PV is required where the usable roof area is under 80 contiguous square feet, or where the required system works out under 1.8 kWdc. With a battery meeting Joint Appendix JA12 and at least 7.5 kWh of capacity, the Equation 150.1-C size may be reduced by 25%.

Battery-ready

New one- and two-unit homes where the utility service is over 125 amps have to be battery-ready (150.0(s)), unless a battery is installed. That means a main panel with a busbar rating of at least 225 amps, four branch circuits that a battery would back up (including the refrigerator, lighting near the main exit and a bedroom receptacle), space for a transfer switch within 3 feet of the main panel, and either battery-ready interconnection equipment or a 1-inch raceway to a backed-up subpanel. All of it belongs on the electrical sheet.

Envelope and verification

Wood-framed walls need at least R-15 cavity insulation in 2x4 framing and R-21 in 2x6 (150.0(c)). Windows must average no worse than U-0.40 as a mandatory minimum, and the prescriptive path asks for U-0.27 in Climate Zones 1 to 5, 11 to 14 and 16, or U-0.30 in Zones 6 to 10 and 15. Ventilated attics under prescriptive Option C need R-38 in Zones 1 and 8 to 16 and R-30 in Zones 2 to 7. A heat pump's refrigerant charge is verified on site by an ECC-Rater in every climate zone.

ADUs

A new detached ADU is treated as a newly constructed building. It needs its own new PV system, and an existing system on the main house cannot be counted toward it, though new panels may be added to the existing system if they are part of the ADU permit and the utility allows it. The battery-ready rules apply only when the ADU has its own service over 125 amps, so most small ADUs on a smaller service are not affected. An ADU whose permit application goes in on or after January 1, 2026 follows the 2025 code.

An attached ADU, junior ADU or garage conversion usually goes through the addition rules below. A junior ADU created as an addition to the house does not need the whole-house ventilation airflow calculation.

For the drawings side of a California ADU, see our California ADU permit drawings guide and the page on garage conversion permit drawings.

Additions

Additions follow Section 150.2(a), and the rules depend on size. Solar PV is not required for additions at any size.

  • 300 square feet or less: the cool roof requirements of 150.1(c)11 do not apply.
  • 700 square feet or less: the prescriptive list applies with modifications. The ventilated attic needs R-38 in Climate Zones 1, 2, 4 and 8 to 16, or R-30 in Zones 3 and 5 to 7, with a radiant barrier in Zones 2 to 15. In Zones 2, 4 and 6 to 15, west-facing glass is limited to 60 square feet, and total glass to the greater of 120 square feet or 25% of the floor area (for additions over 400 square feet), or 75 square feet or 30% (400 square feet or less). Quality insulation installation inspection is not required.
  • Over 700 square feet: most of the new-home prescriptive list applies, with total glass allowed up to the greater of 175 square feet or 20% of the addition's floor area.

At any size, extended walls may keep their existing framing depth with R-15 or R-21 cavity insulation. If heating and cooling are extended from the existing system, the existing equipment does not have to be upgraded, as long as it has the capacity for the added area. A new water heater serving the addition has to be a heat pump water heater, or for an addition of 500 square feet or less, an electric point-of-use heater. Additions that add no more than 1,000 square feet do not need the whole-house ventilation airflow.

When the prescriptive list does not fit, the performance path can model the addition alone, or the existing house plus alterations plus addition together. Upgrading something in the existing house, such as its windows or attic insulation, then earns credit toward the addition.

Alterations

An alteration only has to bring the parts you change up to the code (150.2(b)). The common triggers:

  • Replacing windows or adding glass: the new windows have to meet the U-factor and solar heat gain limits for your zone.
  • Replacing an air conditioner, heat pump, furnace coil or air handler: the connected ducts are leak-tested by an ECC-Rater, the thermostat becomes a setback thermostat, and in many zones the refrigerant charge is verified too.
  • Installing more than 25 feet of new or replacement duct: the ducts have to be insulated and the whole duct system leak-tested.
  • Replacing a heating system: electric resistance may not be the primary heat source, with limited exceptions.
  • Re-roofing more than half the roof: the cool roof requirements apply.
  • Replacing a water heater: the replacement has to meet the water heating rules for alterations.

This is why an HVAC change-out in California comes with a permit and a test: the paperwork is part of the job.

The paperwork: CF1R, CF2R and CF3R

The Title 24 paperwork trail: CF1R at plan check, CF2R during construction, CF3R at final inspection

Title 24 runs on three sets of forms:

  1. CF1R, certificate of compliance. Prepared from the design, usually by an energy consultant, and submitted with the permit. It has to be printed on the plans, include the heating and cooling load calculations, and agree with what the drawings show.
  2. CF2R, certificate of installation. Filled in during construction by the installer of each system: insulation, HVAC, water heating, ventilation, PV.
  3. CF3R, certificate of verification. Completed at the end by an independent ECC-Rater, who tests what the code calls for, such as duct leakage, refrigerant charge and airflow, before the city issues the final.

Where field verification applies, the forms go through an ECC-Provider data registry, and the inspector looks for them there.

What goes on the drawings

Most Title 24 plan check comments come from drawings that do not match the CF1R. A clean set shows:

  • The CF1R printed on an energy sheet, with the climate zone stated
  • Insulation R-values on the wall, roof and floor sections, matching the CF1R
  • A window schedule with each unit's U-factor and solar heat gain coefficient
  • Heating, cooling and water heating equipment with the types and efficiencies on the CF1R
  • The heat pump water heater's location, with the ventilation or room volume it needs
  • On the electrical sheet: the PV system or the reason none is required, the battery-ready panel and circuits, and the electric-ready circuits where gas is used
  • Duct locations and insulation, and the ECC verification items listed on a notes sheet

How we help

We draft California permit sets with the Title 24 information carried through every sheet: sections that match the insulation on the CF1R, window and equipment schedules, the energy notes sheet, and electrical sheets with PV, battery-ready and electric-ready circuits. Your energy consultant runs the calculation and prepares the CF1R; we make sure the drawings and the forms agree, which is where most corrections come from.

Send us your project for a fixed quote, usually within a couple of hours, or read about our permit drawing sets and MEP drafting. If your set has already come back with energy comments, see plan check corrections.

Section numbers refer to the 2025 Building Energy Efficiency Standards (Title 24, Part 6). Your energy consultant and building department confirm which requirements apply to your project.

Topic Cluster · Tools & Drafting Services

Related calculators & drafting services

Check your numbers with the free calculators, or have the sheets drawn by the studio.

Contractor & Builder Resource

Permit and plan-check notes, in your inbox

For contractors, builders and remodelers: plan-check checklists, code changes worth knowing and drafting tips from the studio. About once a month.

I am a:
No spam · About once a month · One-click unsubscribe