MEP drafting services
HearthPlans drafts mechanical, electrical and plumbing sheets: HVAC duct layouts, lighting and power plans, panel schedules, single-line diagrams, plumbing layouts and isometric risers, coordinated with the architectural set. Work is drawn from your design, markups or your engineer’s design; each job is a fixed quote, and a typical residential set takes 3 to 5 business days.
- Turnaround
- 3 to 5 business days for a typical residential set
- Price
- Fixed quote before work starts, usually within a couple of hours
- Revisions
- Two rounds included
- Files
- Layered DWG and DXF, plotted PDF sheet sets
What's included
- HVAC duct layouts and equipment locations
- Lighting and power plans
- Panel schedules and single-line diagrams
- Plumbing layouts, isometric risers and fixture schedules
- Coordination against the architectural plans
Who it's for
- MEP engineers and designers who need sheets produced
- Contractors whose permit needs MEP layouts
- Architects coordinating MEP into their set
What we need from you
- The architectural plans, or the scope to draw them as well
- Your design or markups: equipment, fixtures, panel and circuit information
- Your CAD standards, if you have them
How it works
- 01
Send the scope
Plans, sketches, photos or a scan, plus the address.
- 02
Get a fixed quote
Price, sheet list and delivery date, usually within a couple of hours.
- 03
Review the drawings
You redline; two rounds of revisions are included.
- 04
Receive the files
Layered DWG and DXF and a plotted PDF set.
MEP drafting: common questions
How much does MEP drafting cost?
Each job is quoted as a fixed price for its scope, so you know the total before any work starts. The price depends on the number of sheets and how much has to be drawn from scratch. Send what you have for a quote, usually within a couple of hours.
Can you draw the MEP and the architectural set together?
Yes. Architectural and MEP are often quoted as one package, so the plans and the MEP sheets come from one coordinated model.
What do you need to start the MEP sheets?
The floor plans and the design information: equipment and fixture selections, panel and circuit details, or markups on a previous set.
How long does MEP drafting take?
A typical residential set takes 3 to 5 business days once the scope is confirmed; larger buildings get a date in the quote.
Send the scope, get a fixed price
Plans, sketches, photos or a phone scan are enough to start. You get a price, a sheet list and a delivery date, usually within a couple of hours.
Get a fixed quote