Garage conversion permit drawings
HearthPlans draws permit sets for garage conversions, whether the garage becomes an ADU, a bedroom suite, an office or living space: site plan, existing and proposed floor plans, elevations, a wall section and the details reviewers look for on a conversion. Each set is a fixed quote agreed before work starts, a typical set takes 3 to 5 business days, and two revision rounds are included.
- Turnaround
- 3 to 5 business days for a typical residential set
- Price
- From $499, fixed before work starts, quoted usually within a couple of hours
- Revisions
- Two rounds included
- Files
- Layered DWG and DXF, plotted PDF sheet sets
What's included
- Site plan with setbacks, parking and the converted area
- Existing garage and proposed floor plans
- Elevations showing the garage door infill and new windows and doors
- A wall section through the infill, insulation and floor build-up over the slab
- Egress window size, and smoke and carbon monoxide alarm locations
- Electrical, plumbing and mechanical layouts where a kitchen or bathroom is added
- Energy and insulation notes where your state asks for them
Who it's for
- Homeowners turning a garage into an ADU, bedroom or office
- Contractors who need the permit set before they start
- Owners adding a rental unit
What we need from you
- The property address, so the set follows that building department and its ADU rules
- Photos of the garage inside and out, with the main dimensions
- Or a phone scan of the garage in place of measurements
- What the space will become, and whether a kitchen or bathroom is added
How it works
- 01
Send the scope
Plans, sketches, photos or a scan, plus the address.
- 02
Get a fixed quote
Price, sheet list and delivery date, usually within a couple of hours.
- 03
Review the drawings
You redline; two rounds of revisions are included.
- 04
Receive the files
Layered DWG and DXF and a plotted PDF set.
Garage conversion drawings: common questions
Do I need a permit to convert a garage?
Almost always, once the garage becomes a room people live in. The change of use brings insulation, egress, heating, alarms and, in some places, replacement parking into play. Your building department decides, and its rules for ADUs may differ from those for extra living space.
What drawings does a garage conversion permit need?
Usually a site plan, existing and proposed floor plans, elevations showing the garage door infill, a wall section with the insulation and floor build-up, window and door schedules with the egress opening, and alarm locations. A kitchen or bathroom adds electrical, plumbing and mechanical layouts.
How much do garage conversion permit drawings cost?
Sets start from $499. A single room with no plumbing sits near that; a full ADU with a kitchen and bathroom needs more sheets. Each set is one fixed price, agreed before work starts, usually within a couple of hours.
Can a garage conversion be an ADU?
In many states, yes. California’s state ADU law, for example, makes garage conversions one of the simplest ADUs to permit, and many other states and cities now allow them. Size limits, parking and utility rules vary by city, so the set follows the rules of the address.
What do plan reviewers flag most on garage conversions?
The floor: a garage slab is usually lower than the house and has no vapour barrier or insulation, so the floor build-up has to be shown. Then the garage door infill wall, the egress window size, ceiling height, the fire separation to any garage space that remains, and smoke and carbon monoxide alarms.
Do I need an engineer for a garage conversion?
Often not, when the work stays inside the code’s prescriptive tables. A new opening in a bearing wall, a raised floor over a sloping slab or a second storey usually does. Your building department decides; where one is needed, the structural sheets are drafted from your engineer’s design.
Related Technical & Permitting Guides
Detailed code breakdowns, municipal amendments, and CAD/BIM standards written by our drafting studio.
California ADU permit drawings: sheets, Title 24 and plan check
The sheets a California ADU set needs, the energy compliance, and what plan check asks for.
How to permit an unpermitted addition or conversion
Already converted without a permit? The as-built drawings and the steps to make it legal.
How much do permit drawings cost?
What sets the price of a permit set, typical costs by project type, and how to bring it down.
Send the scope, get a fixed price
Plans, sketches, photos or a phone scan are enough to start. You get a price, a sheet list and a delivery date, usually within a couple of hours.
Get a fixed quote