Articles & Guides

November 22, 2026
HearthPlansTitle 24 in 2026: California Energy Code Requirements for Homes, ADUs and Additions
What the 2025 California Energy Code (Title 24, Part 6), in effect since January 1, 2026, requires for new homes, ADUs, additions and alterations: heat pumps, solar PV sizing, battery-ready panels, addition rules by size, and the CF1R, CF2R and CF3R forms.
Read article
November 22, 2026
HearthPlansDenver Zoning Code for Houses: Zone Districts, Setbacks, Bulk Plane and ADUs
How the Denver Zoning Code works for houses, additions and backyard ADUs: reading your zone district, building forms, base planes and height, the bulk plane, block-sensing setbacks, coverage, and what the site plan must show.
Read articleNovember 19, 2026
HearthPlans12 Reasons Plan Reviewers Send Residential Permit Sets Back (and How to Avoid Each)
The twelve corrections residential plan reviewers ask for most often, from bedroom egress windows and stair dimensions to smoke alarms and sheets that disagree, with a five-minute check to run before you submit.
Read articleNovember 19, 2026
HearthPlansTiny Home Permit Drawings: What a 400 sq ft House on a Foundation Needs
What goes into a permit set for a tiny home on a slab or foundation: the sheets, the IRC tiny house appendix, and the five places small houses get stuck, from the electrical panel to wind uplift and zoning.
Read articleNovember 19, 2026
HearthPlansHow Much Do Permit Drawings Cost? The Six Things That Set the Price
Permit drawing costs by project type, from decks and remodels to ADUs and new houses, what sets the price, seven ways to bring it down, and how to compare quotes.
Read article
November 16, 2026
HearthPlansCan Claude AI and Revit Automate Your Architectural Permit Drawings?
Can Claude AI and Autodesk Revit automate architectural drafting? Discover how AI speeds up permit drawing sets, catches code issues early, and simplifies sheet setups.
Read articleNovember 6, 2026
HearthPlansColorado Building Permits for Contractors: Denver CPD, Snow Loads, Frost Depth and Energy Codes
What Colorado plan reviewers check on residential permits: navigating Denver CPD e-permits, 2021 DBCA amendments, net-zero Denver Energy Code, 36-inch frost lines, Front Range snow drift, and soil heave.
Read article
November 4, 2026
HearthPlans3D Interior Walkthrough Viewer: How Interactive Room Checkpoints and WebGL Space Planning Prevent Remodel Cost Overruns
Discover how HearthPlans' browser-based 3D interior walkthrough engine transforms permit drafting into an interactive spatial experience. Tour 820 Casanova Ave in Monterey, CA with first-person walk controls, room-by-room checkpoint navigation, live material swapping, and 3D spatial hotspot pins—all without installing software.
Read article
October 29, 2026
HearthPlansOutsourcing Permit Drawings: A Contractor's Guide
Why general contractors outsource permit drawings, what plan reviewers expect in a set, how a milestone review keeps you in control, and how to get from a jobsite sketch to a permit set.
Read articleOctober 29, 2026
HearthPlansNortheast Remodel Permits: FAR, Historic Districts and Old-House MEP
A permitting guide for remodelers in New York, New Jersey and Pennsylvania: floor area ratio and coverage limits, historic district approvals, and bringing old framing and electrical up to date on the drawings.
Read articleOctober 29, 2026
HearthPlansCold-Climate Permits: Frost Depth, Snow Load and Basement Egress
What cold-climate plan reviewers in Chicago, Denver and the Upper Midwest check: footing depth below the frost line, snow load and ice barrier details, and basement bedroom egress under IRC R310.
Read articleOctober 29, 2026
HearthPlansCalifornia Permit Drawings: Title 24, CALGreen and WUI for Contractors
What California plan checkers look for in an addition, ADU or remodel set: Title 24 energy forms, the CALGreen checklist, wildfire (WUI) details, and the ADU items that most often draw corrections.
Read articleOctober 29, 2026
HearthPlansTexas Building Permits for Contractors: IRC Amendments, Windstorm and Foundations
How Texas permits differ city to city: local IRC amendments in Dallas, Houston and Austin, coastal windstorm (WPI-8) rules, expansive-clay foundations, and the sheets a permit set needs.
Read article
October 27, 2026
HearthPlansHow to Use the Free Panel Schedule Calculator, Step by Step
A walkthrough of the free electrical panel schedule tool: set up the panel, enter circuits with their load types, check the NEC 220 demand and phase balance, then export a PDF or CSV for your electrical sheet.
Read article
October 16, 2026
HearthPlansCalifornia ADU Permit Drawings: Sheets, Title 24 and Plan Check
What goes into a California ADU permit set, sheet by sheet: Title 24 energy and solar, fire-rated walls near the property line, septic and hillside items, and how to handle plan check corrections.
Read article
October 14, 2026
HearthPlansScan to Chief Architect: LiDAR Scans to Native .plan Models
How an iPhone LiDAR scan or point cloud becomes a native Chief Architect .plan model in your version (X14 to X18), with real wall types, squared rooms, and permit drawings if you need them.
Read article
September 25, 2026
HearthPlansScan to Revit: Point Clouds to Clean BIM Models and Permit Sets
How laser scans and iPhone LiDAR become a clean Revit model in your version (2020 to 2026): preparing the point cloud, LOD 200 versus LOD 300, existing and demolition phases, and the sheets that follow.
Read article
September 18, 2026
HearthPlansDetached ADU Permit Drawings: The 5 Sheets Reviewers Check First
The five sheets a city reviewer looks at first on a detached ADU (backyard cottage): site plan and setbacks, floor plan and egress, fire-rated walls near the lot line, structure, and energy and utilities.
Read article
September 16, 2026
HearthPlansHow to Permit an Unpermitted Addition: As-Built Drawings and Steps
How to legalize an unpermitted addition, garage conversion or finished basement: researching permit records, measured as-built drawings, opening walls for inspection, common code problems, and what it typically costs.
Read article
September 10, 2026
HearthPlansHow to Calculate Plumbing Fixture Units (WSFU and DFU) and Size Pipes
How to size a water service and building drain from fixture units: WSFU and DFU, IPC and UPC values, turning fixture units into peak flow on Hunter's curve, adding continuous flow, and drain sizes by slope.
Read article
September 6, 2026
HearthPlansHow to Calculate Available Fault Current: The Point-to-Point Method
How to work out available fault current for a permit set with the point-to-point method: transformer fault current, conductor C values, the f and M factors, line-to-neutral faults, and checking panel AIC ratings against NEC 110.9 and 110.24.
Read article
September 2, 2026
HearthPlansHow to Calculate a Panel Schedule and Load per NEC Article 220
A step-by-step NEC Article 220 load calculation for a house: how panel slots map to phases, general lighting and small appliance loads, appliances, cooking, dryer and HVAC, a worked example, and feeder and grounding sizes.
Read article
August 18, 2026
HearthPlansA 3D Model Viewer in the Browser for Builders and Real Estate
How a 3D model that opens from a link helps clients, contractors and engineers: trying exterior finishes, checking sun and shade, cutting sections, measuring, and leaving notes on the model itself.
Read article
July 22, 2026
HearthPlansHotel to Apartment Conversions: Change of Use Permits and Life Safety
What it takes to permit a hotel or motel conversion to apartments: change of occupancy from R-1 to R-2, Florida's Live Local Act, adding kitchens, fire separations, sprinklers, egress and the MEP upgrades.
Read article
June 17, 2026
HearthPlansMultifamily Electrical Permits: Meter Stacks, MLO Panels and House Panels
How to lay out multifamily electrical service on the permit drawings: meter stacks and CT cabinets, tenant feeder sizes, main-lug versus main-breaker unit panels, and the house panel for common areas.
Read article
May 21, 2026
HearthPlansThe 5-Foot Rule: Where Plumbing Ends and Civil Site Work Begins
Where the building drain ends and the building sewer begins, who usually draws each one, the cleanout at the hand-off point, and when the plumbing code requires a backwater valve (IPC 715.1).
Read article
April 28, 2026
HearthPlansFlorida Pool Permits: Barriers, Screen Enclosures, Piping and Gas
What a Florida residential pool permit set needs: FBC Chapter 45 barriers and alarms, screen enclosure wind design, the pipe velocity table, anti-entrapment drains, gas line sizing and site setbacks.
Read articleApril 17, 2026
HearthPlansNavigating Building Permits: How to Resolve City Redlines for Residential Additions
How to navigate municipal building department reviews and resolve city plan-check redlines for residential additions. Learn key IRC compliance requirements for basement egress, Bilco bulkhead doors, retaining wall fall hazards, and engineered LVL roof framing.
Read article
March 24, 2026
HearthPlansFlorida Pool Electrical Permits: NEC 680 Bonding, Subpanels and GFCI
What a Florida pool electrical permit needs: the NEC 680.26 equipotential bonding grid, pool subpanel feeder sizes, GFCI for pump motors, generator coordination, deck junction boxes and a sheet checklist.
Read articleMarch 13, 2026
HearthPlansHow to Pass City of Atlanta ADU Permitting: A Guide to Stormwater & Rain Gardens
Stuck in City of Atlanta permit review for your new ADU? Learn how to calculate earthwork quantities, size your green infrastructure, and design an approved rain garden to get your permit issued.
Read article
February 17, 2026
HearthPlansWarehouse and Shop Electrical: Welder Outlets on Shared 50 A Circuits
How to lay out welder and compressor outlets in a warehouse or fabrication shop: multi-outlet 40 and 50 A circuits in non-dwelling buildings, receptacle types and heights, labels, and welder duty-cycle sizing.
Read article
December 3, 2025
HearthPlansRestaurant Tenant Improvement Permits: Hoods, Grease and Power
The MEP drawings a restaurant tenant improvement needs: Type I hoods and makeup air with the fan interlock, grease interceptor connections, the kitchen equipment schedule, disconnects and lighting.
Read article
November 5, 2025
HearthPlansHow to Write a Plan Check Response Letter That Gets Approved
How to answer city plan check corrections so the second review goes smoothly: quoting each comment, saying what changed and citing the code, pointing to the sheet and cloud, and keeping every discipline in step.
Read articleOctober 11, 2025
HearthPlansDenver Permit Drawings: A Guide to CPD Submittals and Local Amendments
What a Denver permit set needs for Community Planning and Development (CPD): the Denver amendments and energy code, Front Range structural criteria, zoning and bulk plane, and a sheet-by-sheet checklist.
Read article
August 27, 2025
HearthPlansiPhone LiDAR to CAD: As-Built Drawings from a Phone Scan
How contractors use an iPhone or iPad Pro LiDAR scan instead of a day with a tape measure: how to scan, how the scan becomes squared CAD walls, how accurate it is, and how to send one in.
Read article
July 16, 2025
HearthPlansOvernight CAD Drafting for Architects, Engineers and Contractors
How overnight drafting across time zones works: send markups at the end of your day and find revised DWG and PDF sheets the next morning, drawn to your layers, text styles and title block.
Read article