12 Reasons Plan Reviewers Send Residential Permit Sets Back (and How to Avoid Each)

The twelve corrections residential plan reviewers ask for most often, from bedroom egress windows and stair dimensions to smoke alarms and sheets that disagree, with a five-minute check to run before you submit.

HearthPlans
12 Reasons Plan Reviewers Send Residential Permit Sets Back (and How to Avoid Each)
Watch: 12 Reasons Your Permit Drawings Get Sent Back (and How to Avoid Each)

Most permit sets that come back from the city do not come back because of something hard. They come back because of something small that was left off: a guard height, a window size, a missing note about smoke alarms.

Each round of corrections costs two to four weeks in most building departments. On a remodel or an addition, that is often the difference between starting in spring and starting in summer.

Here are the twelve things residential plan reviewers flag most often, what they want to see instead, and how to check your own set before it goes in. The figures below come from the International Residential Code (IRC), which most US cities and counties adopt with their own amendments. Always check the edition and amendments your building department uses.


1. A site plan without setbacks

The reviewer needs to see where the work sits on the lot. A site plan that shows the house but not the distances to the property lines will come back every time.

What to show: property lines with dimensions, the existing and new footprint, the distance from each wall to the nearest property line, easements, and the driveway. If you have a survey, the site plan should be drawn from it.

2. Bedroom windows too small to climb out of

Every sleeping room, and most basements, needs an emergency escape opening. Under IRC R310 that usually means:

  • a net clear opening of at least 5.7 sq ft (5.0 sq ft at grade floor level)
  • at least 24 inches high and 20 inches wide, clear
  • a sill no higher than 44 inches above the floor

A 24 by 36 inch double-hung window looks big enough, but its clear opening is roughly half the frame. Put the window schedule on the plans with the net clear opening, not just the rough opening.

3. Stairs that do not add up

Stairs are checked line by line. The IRC limits risers to 7-3/4 inches, asks for treads of at least 10 inches, and wants 6 feet 8 inches of headroom. Handrails sit between 34 and 38 inches above the tread nosing.

The common mistake is a stair that fits the floor-to-floor height on paper but not with real finish floors. Dimension the total rise and show the number of risers.

4. Missing guards on decks and porches

Any walking surface more than 30 inches above the ground below needs a guard, at least 36 inches high on most residential work, with openings small enough that a 4-inch sphere cannot pass through. Decks are the usual offender: the elevation shows a railing, but the plans never say how high it is or how it is fastened.

5. No smoke and carbon monoxide alarms on the plan

This is the easiest correction to avoid and one of the most common. Show smoke alarms in every bedroom, outside each sleeping area, and on every level (IRC R314). Show carbon monoxide alarms where the house has a fuel-burning appliance or an attached garage (IRC R315). A remodel that adds a bedroom usually triggers alarms in the rest of the house too.

6. Headers and beams with no size

"New opening" on a plan is not enough. Every new opening in a bearing wall needs a header size, and every beam needs a size and a bearing point. Where the work is inside the code's prescriptive tables, the size comes from the tables. Where it is not, it comes from your engineer of record, and the plans should say so.

7. Safety glass not called out

Glass near doors, in tub and shower enclosures, near stairs, and in large low panes has to be safety glazing (IRC R308). Reviewers look for a "T" or "tempered" tag in the window schedule. If the schedule does not say it, they will ask.

8. Energy forms missing or out of date

Most departments want proof that walls, roofs, windows and mechanical equipment meet the adopted energy code: an insulation schedule, window U-factors, and often a compliance report. Additions are not exempt. Check whether your city wants a specific form before you submit.

9. Sheets that disagree with each other

The floor plan shows a window 3 feet wide, the elevation shows 4, and the schedule says 3-6. A reviewer cannot approve something the drawings do not agree on. This is the single biggest reason a good set comes back: it was revised in one place and not the others.

How to check: pick five windows and five doors and trace each one through the plan, the elevations and the schedule.

10. Electrical and plumbing left as "by others"

Many departments accept a simple electrical and plumbing layout on residential work, but they still want one. Show outlets, lights, switches and the panel location, plus fixtures and the water heater. A new bathroom or kitchen without a layout is a near-certain correction.

11. Fire separation near the property line

Walls closer than about 5 feet to a property line usually need a fire-resistance rating, and openings in them are limited (IRC R302.1). This catches a lot of garage conversions, ADUs and side additions. The wall section should name the rated assembly.

12. No answer to last time's comments

On a resubmittal, reviewers look for a response letter that answers each comment, says what changed and points to the sheet. Without one, they review the whole set again from scratch. We wrote a full guide on how to write a plan check response letter.


A five-minute check before you submit

  1. Site plan has every setback dimensioned.
  2. Window schedule gives net clear openings for bedrooms and marks safety glass.
  3. Stairs show total rise, number of risers, tread depth and headroom.
  4. Every guard has a height; every header and beam has a size.
  5. Smoke and CO alarms are on the plan.
  6. Energy information is on a sheet or attached.
  7. Five doors and windows agree across plan, elevation and schedule.

None of this is complicated. It just has to all be there at once.


When you would rather not chase corrections

We draw residential permit sets for additions, ADUs, remodels and decks, and we revise them when the city sends comments: two rounds of revisions are included in every fixed quote. Where a project needs an engineer, the structural sheets are drafted from your engineer of record's design.

See what goes into a permit set, or send us your project for a fixed price, usually within a couple of hours.

Topic Cluster · Tools & Drafting Services

Related calculators & drafting services

Check your numbers with the free calculators, or have the sheets drawn by the studio.

Contractor & Builder Resource

Permit and plan-check notes, in your inbox

For contractors, builders and remodelers: plan-check checklists, code changes worth knowing and drafting tips from the studio. About once a month.

I am a:
No spam · About once a month · One-click unsubscribe